What you get
A floor built for the traffic it actually takes: joints filled and supported, edges and thresholds detailed, lines and hazard zones laid into the system rather than painted on top, and a topcoat chosen for the chemistry and the cleaning regime in your building.
It is seamless and closed, so there is nothing for oil, coolant or wash-down water to get into, and it sweeps and scrubs clean. Where fluid reaches the floor the topcoat carries a slip-resistant grade, specified by area rather than applied everywhere, because the texture that is right in front of a wash bay is a nuisance to sweep in a picking aisle.
And it goes in around your operation. We stage by bay or by zone and work nights and weekends where that is the difference between a shutdown and an inconvenience. Every quote sets out the preparation, the joint treatment, the build and the staging plan in writing, so you can hold it against anything else you are sent.





.jpg)
.png)


