Floors for flex units and light industrial suites
A coated floor built around what the unit is actually used for, which in a flex building changes every thirty feet. The warehouse end takes pallet trucks and racking, the assembly bays take benches, tooling and whatever is dropped near them, and the office end is walked on in ordinary shoes. One continuous surface can serve all three, but the build under it should not be the same everywhere, and that is the part a price worked out from a floor plan gets wrong.
The finished floor is seamless and closed, bonded into the slab rather than laid over it. Nothing gets in at a joint, spills sit on the surface until they are cleaned up rather than soaking into the concrete, and the floor sweeps and scrubs rather than needing a routine of its own. Line marking for walkways, racking positions and keep-clear areas goes into the build itself, where it lasts far longer than paint applied over the top.
You get the specification in writing before anything is booked: preparation, the build in each area, the topcoat, the markings and the order the work runs in. It is itemized by zone deliberately, so you can see what you are paying for where and hold it against anything else you have been sent. Industrial and warehouse floors we have finished are on the gallery.





.jpg)
.png)


